Drivers were told to expect delays in the area. Single-lane eastbound will be closed Monday to Friday from 10 am to 2 pm and from 11 pm to 6 am next morning, Saturday from 12:01 am to 10 am, and Sunday from 12:01 am to 11 am and from 10 pm to 6 am next morning. I-25 Colorado Traffic Visit Albuquerque's most reliable source for breaking news. I-25 halts both directions 0 Interstate 40 North Carolina Traffic and Road Conditions. This street will be closed from 9 am to 4 pm Friday through 7/14/23 to facilitate crane operation. This street will be closed from 9 am to 4 pm Friday through 8/31/23 for material deliveries and concrete pours. January Colorado Department of Transportation This street will be closed from 8:45 am to 4:30 pm Friday through 7/11/23 for ISS operations. Single-lane northbound will close Monday to Thursday from 9 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 11 pm to 3 pm next day, and Saturday from 11 pm to 2 pm next day. Street fair organizers are generally permitted to begin WebTrack your route via KOB 4's interactive traffic map. Title: Construction Closure, I 40 eastbound and westbound from mile marker 232, 14 miles east of Clines Corner to mile marker 239, (McKENZIE). There are 9 trading holidays when markets are closed plus several scheduled half-days. Web0 Interstate 40 New Mexico Traffic and Road Conditions. The Colorado Department This street will be closed from 9 am to 4 pm Friday through 8/31/23 for material deliveries. Weekend Traffic Advisory 43 minutes 4:58PM (San Diego Co) is closed from 2200 hrs each night to 0500 hrs each morning Monday This street will be closed from 9 am to 4 pm Friday through 9/5/23 for use of boom truck to work on new building. Saturday from 11 pm to 11 am next morning. WebI-25 New Mexico Weather Conditions (14) Write a Report. This street will be closed from 9 am to 4 pm Friday through 8/31/23 for water distribution valve removal and replacement. This street will be closed Friday from 8 am to 5 pm through 7/9/23 for MTA contract C-35311 work zone & MPT plan. Double-lane eastbound will be closed Monday to Friday from 1 am to 6 am, Saturday from 2 am to 8 am, and Sunday from 2 am to 8 am. Title: Lane Closure, NM 55 from mile marker 6, 6 miles north of US 54 to mile marker 20, 3 miles south of Claunch. Eastbound and westbound at Spur-5, Spur-5 Southbound from University Dr to Old Spanish Trail, Closed Until Further Notice from Monday, May 22, 2023 9:00 AM to Sunday, December 31, 2023 3:00 PM, Closed Until Further Notice from Friday, April 29, 2022 9:00 PM to Monday, April 29, 2024 3:00 PM, Closed Until Further Notice from Tuesday, January 3, 2023 9:00 PM to Friday, September 1, 2023 3:00 PM, Closed Permanently from Friday, January 10, 2020 9:00 PM to Monday, January 7, 2030 3:00 PM, Beltway 8-West Northbound Frontage Road from Memorial Dr to IH-10 Katy, Closed Continuously from Friday, June 16, 2023 9:00 AM to Friday, July 14, 2023 3:00 PM. Severe Weather This street will be closed Saturday from 8 am to 5 pm through 8/29/23 for mobile crane for erection of new building. Title: Roadwork, NM 68 from mile marker 4, 3 miles south of Alcalde to mile marker 12, 2 miles south of Velarde. This street will be closed from 9 am to 3 pm Friday through 7/12/23 to facilitate crane operation. If you would like to share a story idea, please submit it here. 2 hours 2:37PM Hit and Run No Injuries I-10 East at Via Verde. US flight delays: Severe storms snarl airlines' schedules - CNN 25 Raton Conditions. TYPE: Miscellaneous Minor -. This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 7/11/23 for major gas installation. Stay alert for changing road and weather conditions. 25 Rincon Conditions. This street will be closed from 9 am to 4 pm Saturday through 7/5/23 for concrete pumps and boom truck to work on new building. Southbound I-25 fully open after crash closed two lanes Also, single-lane will be closed southbound Van Wyck Expressway connection to the eastbound Belt Parkway/Nassau Expressway, and northbound between exit ramp to eastbound Belt Parkway/Nassau Expressway and entrance ramp from westbound Nassau Expressway through September 20, 2023. I-25 Albuquerque, NM Accident Reports. Real-Time Traffic and Travel Information for Medford, Oregon. Authorities tried to stop the truck with stop sticks on Interstate 25 near the Garden of the Gods exit, but were not successful. * In known extreme weather events or accidents, the map provider may still show green lines, even if lanes or the entire road is closed. WebKOAT Action 7 News is your source for the latest local headlines and live alerts. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. Central Blvd both ways. This street will be closed Friday from 9 am to 4 pm through 8/9/23 to facilitate crane operation. The Economic Update with Tatiana Bailey Ph. It reopened by 2:30 a.m. Tuesday. Title: Roadwork, US 285 from mile marker 38, 3 miles north Carlsbad to mile marker 42, 7 miles north Carlsbad. 324.07 to 330.24. Other Cities Along I-25. Double-lane southbound will close Monday to Friday from 12:01 am to 5 am, Saturday from 1 am to 6:30 am, and Sunday from 2 am to 9 am. WebI-25 Pueblo, CO Weather Conditions. I-25 News - Roadnow Title: undefined, I 25 from mile marker 276, (NM 599) to mile marker 302, 18 miles north of Santa Fe. I-25 WebI-80 Nebraska real time traffic, road conditions, Nebraska constructions, current driving time, current average speed and Nebraska accident reports. 2023 | Starsystems/USAStar Internet Services | All Rights Reserved. This street will be closed from 9 am to 4 pm Friday through 10/1/23 for gas main lining permit B01-2023086-A66. Additional lane will be closed Friday from 11 pm to 5 am, Saturday and Sunday from 1 am to 8 am, and Sunday night from 10 pm to 5 am next morning through March 3, 2025, to facilitate East 138 Street Bridge replacement. Traffic Milling plant mix, bituminous pavement surfacing, plant mix wearing course, bridge rehabilitation, and miscellaneous work in both directions. The New Jersey Turnpike Authority is dedicated to the safe and efficient movement of people and goods over two of the busiest toll roads in the United States the New Jersey Turnpike and the Garden State Parkway. Single-lane northbound will close Monday to Thursday from 9 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 11 pm to 3 pm next day, and Saturday from 11 pm to 2 pm next day. According to CDOT, this is one of the last major phases of the I-25 Gap Project. Bronx-bound right-lane will be closed Monday to Friday from 7 am to 3 pm and alternating center-lane will be closed from 10 am to 2 pm. Right lane and right shoulder closed. According to Colorado State Patrol, the initial call came in at 2:10 p.m. CSP says it was initially reported there were eight-vehicle involved. Title: Alert, NM 518 from mile marker 43, 3 miles south of Angostura to mile marker 65, 1 mile north of Vallecitos. These closures are necessary to facilitate replacement of upper roadway. Scan this QR code to download the app now. 25 Buffalo Conditions. Right-lane will become an exit only lane at Exit 3 24/7. North sidewalk will be closed. Single-lane in both directions will be closed Friday from 10 am to 2 pm and from 11:59 pm to 8 am, Saturday from 11 pm to 10 am, and Sunday from 10 pm to 6 am. Manhattan-bound will be fully closed Monday to Friday from 12:01 am to 5 am and Saturday from 12:01 am to 7 am. 25 Monument Traffic. January 18, 2023 - Southwestern Colorado - The pass will close at 5 p.m., eastbound traffic will be stopped near the pass summit at Mile Point 199. This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 7/30/23 for NYCDOT MED 645 inclusion in area watermain. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 11 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 6 am next morning, and Saturday from 10 pm to 11 am next morning. I80: Road damage, Right lane blocked EASTBOUND near Patrick Draw at milepost 140.1, Expect delays. First published on April 8, 2021 / 11:22 AM. Overturned commercial truck and the entire road is closed. I-25 Title: Roadwork, US 54 from mile marker 122, 1 mile south of Carrizozo to mile marker 123, Carrizozo. AVOID IT!! Intermittent 15-minute full closure in one direction at a time may occur Monday to Saturday between 2 am and 5 am except holidays and embargo days for maximum of five nights. I-25 Albuquerque, NM in the News. I-25 closures continue during demolition of County Line WebCommunities along the I-25 North corridor are expanding rapidly, contributing to major economic growth in northern Colorado. This was around 5:30 p.m. As officers gave orders to the suspect, a Fountain police officer fired at least one gunshot at the suspect, hitting him. Real-Time Traffic and Travel Information for Bellingham, Washington. Expect intermittent lane closures, ramp closures and detours in place throughout the work zone. Edit: lanes are now open but it is still a cluster fuck. Traffic Get browser notifications for breaking news, live events, and exclusive reporting. If you do not see any markers on the map, try zooming in one or two levels using "+" on the top left side. KRDO NewsChannel 13 is committed to providing a forum for civil and constructive conversation. Raton traffic updates reporting highway and road conditions with live interactive map including flow, delays, accidents, construction, closures,traffic jams and congestion, driving conditions, text alerts, gridlock, and driving conditions for the Raton area and Colfax county. Single-lane westbound will be closed Monday to Thursday from 10 am to 3 pm and from 10 pm to 5 am next morning, Friday from 10 am to 3 pm and from 10 pm to 6 am next morning, and Saturday from 11 pm to 6 am next morning. Single-lane Brooklyn-bound south upper roadway will be closed Thursday to Saturday from 1 am to 5 am. This street will be closed from 9 am to 4 pm Friday through 7/31/23 for manlift work related to local 11 work. Title: Crash, US 54 at mile marker 320, 6 miles south of Logan. I-25 pueblo Traffic This street will be closed from 9 am to 4 pm through 8/26/23 boom truck and concrete pump. I-25 New Mexico Road Conditions Title: Roadwork, US 380 at mile marker 65, Carrizozo. This street will be closed from 8 am to 4 pm Saturday through 7/8/23 for knuckle boom lifting/hoisting operations. 2023-06-28 Roadnow. Closed Continuously from Friday, June 23, 2023 9:00 AM to Sunday, July 23, 2023 3:00 PM, North Sam Houston Tollway Eastbound At Antoine Dr to North Sam Plaza, Closed Daily from Thursday, June 29, 2023 11:00 PM to Friday, June 30, 2023 5:00 AM, FM-2920 Eastbound and westbound from STUEBNER AIRLINE RD to TC Jester Blvd, Closed Permanently from Monday, January 17, 2022 1:00 AM to Friday, December 31, 2032 11:30 PM. This street will be closed from 9 am to 4 pm Saturday through 8/17/23 for concrete pump/boom to be placed on the roadway. 65MPH and 45MPH through active work zones. Summer in the Park with the Alamosa Public Library! DOT posts bring the latest incidents and their status. This street will be closed from 8 am to 10 pm Saturday and Sunday through 7/2/23 for major gas installation. Right lane and right shoulder closed. Title: Lane Closure, US 550 northbound and southbound from mile marker 160, Aztec to mile marker 165, 1 mile south of Inca. 25 Denver Conditions. I-25 Northbound currently closed south of Bellview, totally F'd. Whats happening on Interstate 5 RIGHT NOW! This street will be closed from 8 am to 6 pm Saturday, and Sunday from 9 am to 6 pm Sunday through 7/16/23 for installing facade panels. The City of New York's Department of Transportation issued a traffic alert for this week providing the locations of road construction and events where lane and street closings will affect the flow of traffic. This street will be closed from 9 am to 4 pm Friday through 7/23/23 to accommodate a boom truck. Current severity is major. I-26 Traffic Guide. This street will be closed from 9 am to 4 pm Friday, and 9 am to 6 pm Sunday through 7/14/23 to facilitate crane operation. This street will be closed from 9 am to 4 pm Friday through 7/3/23 to facilitate crane operation. Click for Real Time Traffic . Reddit, Inc. 2023. News / Feb 18, 2021 / 02:32 PM MST. Real-Time Traffic and Travel Information for Redding, California. Roadwork I-25 milepost 271-281 both directions between Kaycee and Buffalo NHPPI-I255117 Stephan Charles 307-425-6605: Riverside Contracting, Inc. This street will be closed 24/7 through 9/10/23 for new building construction operations. Center of the roadway will be closed and approximately 36 parking spots from both sides of the roadway will be temporarily removed and utilized to maintain two-way traffic, Monday to Friday from 10 pm to 5 am next morning. I-25 Additional lane will be closed Friday from 11 pm to 5 am, Saturday and Sunday from 1 NB I-25 closed for extended time due to emergency . may be closed for longer to allow for set-up and breakdown. All lanes reopened at 11:30 a.m. after being closed for about an hour. HBX180. Single-lane northbound will be closed Monday to Friday from 7 am to 9 am. These closures are necessary to facilitate Westchester Avenue Bridge reconstruction and will continue through December 31, 2023. Expect intermittent lane closures and delays. Title: Construction Closure, NM 14 northbound at mile marker 3, 1 mile north of Cedar Crest. Traffic is exiting backwards down the entry ramp. construction. Double-lane westbound will be closed Monday to Friday from 12:01 am to 5 am, Saturday from 12:01 am to 6 am, and Sunday from 12:01 am to 7 am. This street will be closed from 9 am to 4 pm Saturday through 8/15/23 for deliveries, loading and unloading. Because incidents and road conditions, whether attributable to traffic crashes or are weather-related, can rapidly change, this website may not reflect all incidents or road conditions for every route and should not be your only source for Daily Briefing drawing brain activated and i can draw so much right now.. but am so sleeby and drawing through half-closed eyelids why brain focus only activate when it's 4am 25 Whiteout conditions have closed a 70-mile stretch of Interstate 80 in the Sierra as a blustery Christmas weekend storm dumps snow on the Tahoe area. Also, the East 18 Street on-ramp to southbound FDR and off-ramp from northbound FDR will be partially closed during these times. Title: Construction Closure, NM 6 eastbound and westbound at mile marker 36, Los Lunas. RoadNews includes related I-5 articles. 25 Las Vegas Conditions. This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 7/2/23 to install water and sewer services. This street will be closed from 8 am to 4 pm Saturday through 7/13/23 for gas main lining. Interstate 25 TripCheck Single-lane in both directions will be closed Monday to Friday from 9 am to 1 pm and 10 pm to 7 am next morning. These closures are necessary to facilitate Westchester Avenue Bridge reconstruction and will continue through December 31, 2023. 25 Glendo Conditions. This street will be closed from 8 am to 6 pm Saturday, and 9 am to 6 pm Sunday through 7/9/23 for window cleaning from boom truck. Northbound I-25 closed 6 p.m. to 7 a.m. Southbound I-25 closed 7 p.m. to 8 a.m. Single-lane southbound will close Monday to Thursday from 10 am to 3 pm and 10 pm to 5 am next morning, Friday from 10 am to 3 pm and 10 pm to 6 am next morning, and Saturday from 10 pm to 2 pm next day. Eastbound will be reduced to single-lane and the south sidewalk will be reduced to 5-foot width, 24/7. source: Bing. Single-lane Manhattan-bound lower roadway will be closed Saturday to Friday 24/7. Southbound exit ramp to 138 Street bridge will be closed Friday from 11 pm to 6 am, Saturday from 11 pm to 9 am next morning, and Sunday from 11 pm to 5 am next morning to facilitate water main connections. See the latest road closures, crashes, and delays here. On and Off-Ramps within this segment will be reduced to 14 feet Monday to Saturday from 10 pm to 5 am next morning. This street will be closed from 9 am to 4 pm Friday through 9/1/23 for support activities on Canal (periodic extended openings). Southbound I-25 Reopens In Denver Tech Center After Multi-Car Title: Construction Closure, NM 116 northbound and southbound at mile marker 6, 1 mile south of Sabinal. I-25 closed This street will be closed from 9 am to 4 pm Friday through 9/1/23 to facilitate crane operation. These closures are necessary to facilitate Structural Strengthening. Our maps show updates on road construction, traffic accidents, travel delays and the latest traffic speeds.

Coosa Valley News Arrests, Articles W

why is i25 closed right now